*The Final WW Date is the final date from which you can withdraw from the unit without academic penalty, however you will still incur a financial liability (see
Withdrawal dates explained for more information).
DESCRIPTION Psychrometry including air conditioning systems. Refrigeration cycles and working fluids. Vapour compression and heat pump systems. Heating / ventilation and air-conditioning design - heat load calculations, choice of system, pipe and duct sizing, Computational analysis, natural ventilation.. A major project component which will involve the design of a air conditioning system for a large scale application.
WEIGHT:
12.5%
ASSESSMENT: exam (50%), lab and assignments (20%), major project (20%)
FLEXIBLE & ONLINE STUDY OPTIONS Note: Class attendance may still be required
Resource supported teaching & learning -
H
Additional resources are provided for your optional use; e.g. audio taped lectures
About Flexible Study Options
REQUISITE INFO
Prereq
KNE354
TEXTS Information about any textbook requirements for Semester (Sem 2) will be available from mid April 2010
Units are offered in attending mode unless otherwise indicated (that is attendance is required at the campus identified). A unit identified as offered by distance, that is there is no requirement for attendance, is identified with a nominal enrolment campus. A unit offered to both attending students and by distance from the same campus is identified as having both modes of study.
Campus - H Hobart, L Launceston, W Burnie. Study Centre - V Sydney, R Rozelle. Distance units may also have a campus identifier of I Isolated, N Interstate, O Overseas. Units delivered in Transnational Education (TNE) Programs have a campus identifier of A Hangzhou, F Fuzhou, G Shanghai, J Indonesia, K KDU Malaysia, Q Kuwait or Z New Zealand.
Special approval is required for enrolment into TNE Program units - campuses A, F, G, J, K, Q and Z click here for more information.